Warning: Missing argument 1 for onetone_get_breadcrumb(), called in /homepages/8/d584214332/htdocs/ptb.co.uk/wp-content/themes/ptb/archive.php on line 15 and defined in /homepages/8/d584214332/htdocs/ptb.co.uk/wp-content/themes/onetone/includes/theme-functions.php on line 85

The Coliseum, London

coliseum-lodon

Bang on schedule, PTB completed the installation of the new dimmer system for English National Opera at the London Coliseum. In just five weeks, PTB removed the fifteen existing, problematic Strand SLD96 dimmer racks and replaced them with ten new ABD Eurodim Twin Tech racks, incorporating the DimSwitch modules that can operate as either dimmers […]