P&O Dry Docks 2017

Arcadia

Local Entertainment System Upgrades, Arcadia and Oceana. P&O Cruises tendered works to be carried out on two ships whilst in dry dock, to be carried out consecutively in Hamburg, Germany. Push The Button worked with Carnival UK’s entertainment department. The team worked on the Arcadia to deliver local entertainment system upgrades to the Rising Sun, […]

Shaftesbury Theatre Dawlish

Shaftsbury_Theatre

Production Lighting Upgrades Following the installation of new pile winches and hemp flying bars in 2015, Push The Button worked with the staff and volunteers at the Shaftesbury Theatre Dawlish to overhauled their production lighting. All of the twin and earth cables were removed and replaced with a galvanised trunking system and custom internally wired […]

London Theatre Company

Bridge Theatre

Bridge Theatre Push The Button were employed to join the gaps between items delivered in the main contract and items rewarded as a direct loose equipment supply.  At short notice, Push The Button installed a comprehensive network of CAT5 tie lines that gave the theatre users the option of extending networking or providing single universe […]

Guildhall School of Music and Drama

OLYMPUS DIGITAL CAMERA

Silk Street Theatre, Production Lighting Upgrades Push The Button worked with Theatre Projects on a performance specification to provide an ETC Sensor Dimming replacement to the ageing legacy Strand LD90 Dimmers, together with a comprehensive LED working light and house lighting system. As this is a Grade II listed building, considerable work was undertaken to […]

National Theatre

Lyttelton

Lyttelton Theatre Production Lighting Upgrades The National Theatre management decided to remove the distributed dimming from the Lyttelton Theatre and revert back to a central dimmer room. Push The Button worked with Lighting Resources to facilitate the design. Push The Button also undertook the replacement of two legacy distribution boards (TP1 and TP2) which had […]

Sense

Sense

Flexible Learning and Performance Space Sense have relocated to a new purpose-built premise in Selly Oak Birmingham, housed within the building is a flexible learning and performance space. Push The Button worked with Laura Benson and Stephanie Tyrell to install a small infrastructure of Lighting, Audio and Video to meet their budget and expectations. Push […]

Bristol Hippodrome

Bris Hip 1

LED Houselighting The Bristol Hippodrome were looking to replace their tungsten houselighting system with an LED alternative and Push The Button were approached to help with the design and installation. This was a special project for Push The Button managing director, Nick Ewins, who worked on the upgrade of the venues gas emergency lighting to […]

Edinburgh Playhouse

Edinburgh Playhouse 2

LED Houselighting The Edinburgh Playhouse carried out a full auditorium re-decoration over a number of short closure periods with some unique access solutions to minimise the closure period. Push The Button worked with the Theatre’s technical staff and ATG’s technical management to design and install a GDS ‘Fade to Warm’ ArcLamp system, supplemented by discreetly […]

Fantastic Journey

Fantastic Journey

LED Scenic Panels A departure from Push The Buttons normal remit saw the team working with Princess Cruises to supply an innovative solution for a comprehensive LED installation onto motorised scenic panels. Working with Brilliant Stages and Stage Technologies, Push The Button provided two hundred thousand pixels of addressable LED. A total of three hundred […]

West Horsley Place

WHP

New Opera Theatre Grange Park Opera undertook the ambitious feet of building a new Opera Theatre within 14 months and Push The Button were proud to be asked to provide all of the new technical infrastructure. The project included relocating some equipment from the company’s previous residence in Hampshire. Push The Button worked with the […]